Project Summary

Path Construction completed the installation of foundations, structural steel, and a boiler stack at an operational power plant. This project required careful coordination to minimize disruption to the facility’s daily operations. The work was executed with a focus on safety, efficiency, and structural integrity, meeting all project specifications while maintaining continuous plant functionality throughout the process.