PROSTHETIC PLASTER LAB: Renovation of the Prosthetic Lab at fully functional RIC Medical Facility. Scope included demolition, metals, racking, HVAC, carpentry, couters, specialty equipment, mechanical piping, and electrical work.
3RD FLOOR RADIOLOGY/PHLEBOTOMY: Renovation of the 3rd floor radiology/phlebotomy centers within fully operational medical and rehabilitation facility. Scope included temporary enclosures, demolition, carpentry, casework, doors/frames/hardware, finishes, drywall, aegis microbrial shield, flooring, painting, mechanical piping, HVAC, plumbing, and electrical work.
14TH FLOOR: Renovation of the 14th floor of the Rehabilitation Institute of Chicago within fully operational facility. Scope included temporary enclosures, demolition, carpentry, casework, doors/frames/hardware, windows, finishes, drywall, HVAC, flooring, painting, window treatments, mechanical piping, plumbing, and electrical work.
14TH FLOOR RESEARCH LABS: Renovation of the 14th Floor Research Labs within fully operational facility. Scope included temporary enclosures, demolition, carpentry, casework, doors/frames/hardware, windows, finishes, drywall, flooring, painting, window treatments, mechanical piping, HVAC, plumbing, and electrical work.
PHARMACY REMODEL: Renovation of the Pharmacy at the RIC while maintaining full operational pharmacy during construction. Scope included temporary partitions, work stations, demolition, carpentry, drywall, lockers, finishes, VCT, painting, electrical, and mechanical work.
ELECTRO PHYSIOLOGY ROOM 1727: Replacement of ceilings to provide for access for new medical rehabilitation equipment. Scope included demolition, electrical modifications, acoustical ceilings, and sprinkler work.
ELECTRO PHYSIOLOGY ROOM 1786: Replacement of ceilings to provide for new medical rehabilitation equipment. Scope included demolition, electrical modifications, acoustical ceilings, and sprinkler work.