Construction of a 105,000-square-foot, three-story LEED Gold building with a mechanical penthouse on the existing campus. The building is a learning center for students’ transportation, distribution, and logistics. The scope included but was not limited to, aluminum and glass curtain walls, roofing, MEP systems, interior masonry wall construction, interior finishes, site improvements, concrete paving, and landscaping.