The North Shore Water Reclamation plant consisted of 10 water plants and pump stations that had concrete repairs, epoxy injection, sealant repairs and some specialty work. The following are the repairs that were performed on the project:
Epoxy Crack Injection
Deep Crack Injection (Epoxy Injection and Concrete Repair)
Routing and Caulking
Sealant Repair
Expansion Joint Repair
Concrete Repair
Shotcrete Repairs (specialty).
Flatwork
Handrail Replacement
Misc Steel Repair
Pipe Repairs
Electrical Junction Box Gutter Repairs
Pressure Grouting (kind of a specialty)
Soil Boring
Crystalline Waterproofing (specialty)
Crystalline Injection Repair (specialty)
Cured In Place Pipe (specialty)
Chemical Resistant Topping (specialty)
Tnemec Liner
Concrete Topping