Path Construction completed maintenance work on a segment of Illinois Route 390, the 9.8-mile Elgin–O’Hare Tollway in Northeastern Illinois. The project scope included joint repairs, concrete rapid-set patches, Class B patches, and deck sealing. These improvements enhanced roadway durability, extended the tollway’s service life, and maintained safe, reliable travel for motorists. The work was executed efficiently to minimize traffic disruption, ensuring continuity for daily commuters and supporting the overall operational integrity of this critical electronic toll highway connecting major regional destinations. Path Construction delivered a high-quality infrastructure solution that reinforced the tollway’s structural performance and safety standards.
I-390 Tollway
- Location: Illinois
 
								