This commercial redevelopment project featured the full demolition of a 100,000-square-foot anchor retail store, paving the way for future site development. A major scope of work included the strategic reconfiguration of a shared wall to maximize usable space and enhance structural flexibility.
To ensure long-term stability, the 100,000 SF building pad underwent cement stabilization, a critical step in preparing the site for future vertical construction. Essential underground site utilities were installed, including storm drainage, sanitary sewer, and fire protection lines—laying the groundwork for compliant, functional infrastructure.
The project also included extensive asphalt and concrete work for sidewalks, curbs, and parking lots. These improvements significantly enhanced site accessibility, vehicular flow, and pedestrian safety, aligning with modern commercial design standards.