Path Construction successfully executed the installation of foundations, structural steel, and a boiler stack at an operational power plant. This critical infrastructure project required meticulous coordination to minimize disruption to the facility’s daily power generation. The work was performed with an unwavering focus on safety, efficiency, and structural integrity, successfully meeting all project specifications while seamlessly maintaining continuous plant functionality throughout the entire construction process.