Path Construction completed a cannabis processing facility by leveraging a design-build approach and a team experienced with both the asset type and client. The team reused existing building systems to streamline the schedule and reduce scope. Subcontractors from past projects ensured consistency, while early engagement and close coordination with the client, design team, and vendors minimized delays, change orders, and costs, resulting in an efficient, well-executed project.
STL Processing
- Location: St. Louis, MO
- Architect: Design-Build | Path Construction
- Owner: MBE Healthcare Solutions II