This project involved the construction of a new, modern water treatment plant following the demolition of the existing plant and iron filter. The core of the work was the construction of a new 2,000 SF masonry and framed water treatment plant, including the installation of all new site utilities. Inside the new facility, the scope included furnishing and installing a new Deep Well Turbine Pump, a Horizontal Pressure Filter System, an Emergency Gas Scrubber System, and new Fluoridation and Chlorination Equipment. The entire system was integrated with modern SCADA controls and finished with necessary start-up services. Site restoration included a new asphalt drive and general landscape restoration.
Well 10
- Location: Cary, IL
- Architect: Strand Associates, Inc.
- Owner: City of Cary
