Restoration of Water Reclamation Equipment and Facilities. The Replacement of several Digester Tanks at the WWTP in Schaumburg, IL. Scope included replacing two 100’ diameter tank membranes and the restoration of two metal digester tanks including removal of digester sludge and cleaning of the tanks.
Rehabilitation of four existing Digester tanks including replacement of gas holding membranes, water & sewage piping, and sandblasting & re-coating of the tanks with high performance costings while keeping the tanks & the plant operational.