The project involved:
- Renovating lecture halls and offices.
- Replacing windows.
- Upgrading the HVAC system.
- Constructing a new concrete and masonry stair and ADA ramp entrance to improve accessibility to the southeast portion of the building.
- Tuck-pointing the southeast building elevation.