Aeration System Improvements
LOCATION
Gurnee, Illinois

 

OWNER
North Shore Water Reclamation District

 

ARCHITECT
Donohue and Associates

 

CONTRACT VALUE
$4,000,000

PROJECT SCOPE

This specific project required deep knowledge and insight into the water filtration system and include removing and replacing seven aeration motors and piping blowers during the first stage. It also included reinstalling new air mixture systems to improve and meet EPA standards. The 2nd stage included a new nitrification system and replacing four existing sluice gates along with replacing existing aeration piping with a redesigned header system from below grade to above grade requirements. Additional work was done on the concrete foundation of the auxiliary basin to reinforce the structure.

 

 

 

Chicago • Scottsdale • Detroit

© 2017 Path. All rights reserved